Located in Heibei Province on the banks of the Chaobai River , the Yanjiao Economic and Technological Development Zone (ETDZ) faces Beijing across the river and is 30 kilometres east of Tiananmen square. Yanjiao ETDZ covers an area of more than 80 square kilometres and integrates science and technology with manufacturing, tourism, finance and commercial activities. It has attracted investors from more than 10 countries and a total foreign investment of USD 2.5 billion. In 2001, Yanjiao ETDZ was approved as a priority export base for the software industry in Hebei province.

In October 2001, a CJV (Yanjiao CW) was established as a joint venture between The China Water Company (CW) and Sanhe Yanjiao Water Company to develop and manage the water supply in Yanjiao ETDZ.

This water supply project includes construction of new water treatment facilities and operation of existing boreholes for raw water, treated water storage and delivery to pipe network. Yanjiao CWC supplies an area of 30 square kilometers with a population of around 300,000. The new water treatment facilities were completed in two phases with a total supply capacity of 60 Mld.

The first phase of the project involved renovation of an existing 20 Mld water treatment works.

The second phase was to build water treatment facilities of 40 Mld. Construction was completed in Aug. 2003 .

The raw water is from 3 well-groups comprising 20 boreholes (depth 300m) located 10 km away from the plant. Raw water pumps are 22m under the ground so as to ensure constant, reliable and good quality water. The treatment process is controlled fully automatically with imported equipment. Water quality and supply safety are ensured by advanced security monitoring systems. In order to meet rapidly increasing demand, CW has embarked on an investment programme in 2008 to enhance the raw water capacity by refurbishing existing boreholes and acquiring new ones.

The water supply system comprises boreholes for the raw water supply followed by:
• chlorination
• automatic control system
• Two treated water storage tanks each with a capacity of 4,000m3

In November 2004, Yanjiao CW obtained ISO9001-2000 quality management system certification through DNV.

 

 




Summary

Client: Sanhe Yanjiao Water Company Location: Yanjiao, Heibei Province
Project duration: 25 Years Project Type: Joint venture, TOT+BOT for bulk water supply
Population served: 300,000
Production capacity: 60 Mld